ASSEMBLY
ASSEMBLY |
(1)
|
Connecting
rod bearing
|
(5)
|
Second
ring
|
Tightening torque: Nm (kgf-m, ft-lb)
|
|
(2)
|
Connecting
rod
|
(6)
|
Top ring
|
T:
|
45 (4.6, 33.3)
|
(3)
|
Connecting
rod cap
|
(7)
|
Snap ring
|
||
(4)
|
Oil ring
|
(8)
|
Side mark
|
Apply oil to the surfaces of the connecting rod bearings.
Install the connecting rod bearings on connecting rods and connecting rod caps.
Position each connecting rod with the marked side facing forward, and install it.
Install the connecting rod cap with connecting rod nut.
Ensure the arrow on connecting rod cap faces toward front during installation.
Important | ||
• |
Each connecting rod has its
own mating cap. Make sure that they are assembled correctly by checking
their matching number.
|
|
• |
When tightening the connecting rod nuts, apply oil on
the threads.
|
|
Install the expander, lower rail and upper rail in this order by hand. Install the second ring and top ring with a piston ring expander.