INSPECTION
INSPECTION |
CHECK SHIFT LOCK SOLENOID.
Measure the resistance of shift lock solenoid connector terminals.Terminals
No. 4 — No. 5:
Is the resistance between 20 and 40 Ω?
Yes |
No |
Replace the shift lock solenoid and “P” range switch assembly.
CHECK SHIFT LOCK SOLENOID.
Connect the battery with shift lock solenoid connector terminal, operate solenoid.Terminals
No. 4 (+) — No. 5 (−):
Is the shift lock solenoid operating properly?
Yes |
No |
Replace the shift lock solenoid and “P” range switch assembly.
CHECK “P” RANGE SWITCH.
Move the select lever to “P” range.Measure the resistance between “P” range switch connector terminals.
Is the resistance less than 1 Ω?
Yes |
No |
Replace the “P” range switch.
CHECK “P” RANGE SWITCH.
Move the select lever to other than “P” range.Measure the resistance between “P” range switch connector terminals.
Is the resistance more than 1 MΩ?
Yes |
Normal
No |
Replace the “P” range switch.