INSTALLATION
INSTALLATION |
PITCHING STOPPER |
Install the pitching stopper.
Tightening torque:
T1: 50 Nm (5.1 kgf-m, 37 ft-lb)
T2: 58 Nm (5.9 kgf-m, 43 ft-lb)


Remove intercooler. (Saab 9-2X 2.0T Aero)

TRANSMISSION REAR CROSSMEMBER AND REAR CUSHION RUBBER |
Install the rear cushion rubber.
Tightening torque:
39 Nm (4.0 kgf-m, 29 ft-lb)
Install the crossmember.
Tightening torque:
T1: 35 Nm (3.6 kgf-m, 26 ft-lb)
T2: 70 Nm (7.1 kgf-m, 51 ft-lb)

Remove the transmission jack.
Install the heat shield cover. (If equipped)
Install the front, center, rear exhaust pipes and the muffler. (Saab 9-2X 2.5i Linear)



Install center and rear exhaust pipes, and muffler. (Saab 9-2X 2.0T Aero)


