INSTALLATION
INSTALLATION |
PITCHING STOPPER |
Install the pitching stopper.
Tightening torque:
T1: 50 Nm (5.1 kgf-m, 37 ft-lb)
T2: 58 Nm (5.9 kgf-m, 43 ft-lb)
and
Install the intercooler. (Saab 9-2X 2.0T Aero)
Connect the battery ground cable to battery.
CROSSMEMBER AND CUSHION RUBBER |
Install the rear cushion rubber.
Tightening torque:
35 Nm (3.6 kgf-m, 26 ft-lb)
Install the rear crossmember.
Tightening torque:
T1: 70 Nm (7.1 kgf-m, 51 ft-lb)
T2: 140 Nm (14.3 kgf-m, 103 ft-lb)
Remove the transmission jack.
Install the heat shield cover. (If equipped)
Install the front and center exhaust pipes. (Saab 9-2X 2.5i Linear)
Install the center exhaust pipe. (Saab 9-2X 2.0T Aero)
Install the rear exhaust pipe and muffler.