INSTALLATION
/
9-2X (9346)
/
2005
/
8. Body
/
EXTERIOR BODY PANELS
/
Front Hood
/
Adjustment/Replacement
/
INSTALLATION
INSTALLATION
Install in the reverse order of removal.
Adjust the clearance between front hood panel and front fender panel. Clearance must be equal at both sides.
Tightening torque:
24.5 Nm (2.5 kgf-m, 18.1 ft-lb)