Prepared parking-heater installation, diesel
Prepared parking-heater installation, diesel |
The following feeds pass through the connector:
Pin 1
|
+54 from fuse 14
|
Pin 2
|
Supplementary heater on/off
|
Pin 3
|
--
|
Pin 4
|
Ground (to grounding point G30)
|