Turbo
Turbo |
|
To remove |
1. |
Remove the battery cover and disconnect the negative battery lead from the battery.
|
2. |
Remove the upper engine cover.
|
3. |
Disconnect the intake pipe from the mass air flow sensor, turbocharger and camshaft cover.
|
4. |
Remove the charge air pipe from the turbocharger and camshaft cover. Bend aside the charge air pipe and plug the pipe and the turbocharger inlet.
|
5. |
Remove the wiring mounting from the camshaft cover and the connectors from the glow plugs and mass air flow sensor. Move the wiring out of the way.
|
6. |
Remove the heat shields from over the turbocharger and exhaust manifold.
|
7. |
Remove the heat shield over the starter motor.
|
8. |
Remove the cable duct bolts.
|
9. |
To improve access, remove the lower bolt from the engine lifting eye.
|
10. |
Remove the upper bolt from the exhaust manifold support. Slacken the lower bolt slightly so that the support can be turned out of the way.
|
11. |
Remove the turbocharger's oil delivery pipe.
|
12. |
Detach the exhaust pipe from the turbocharger.
|
13. |
Remove the turbocharger's oil return pipe from the engine block.
|
14. |
Disconnect the vacuum hose from the wastegate diaphragm unit.
|
15. |
Remove the exhaust manifold and lift out the turbocharger along with the exhaust manifold.
|
16. |
Remove the turbocharger from the exhaust manifold.
|
To fit |
1. |
If changing the turbocharger: Transfer the oil return pipe to the new turbocharger. Use new seals.
|
2. |
Clean the sealing surfaces. Apply
30 20 971 Screw-thread paste
to the sealing surfaces and studs. Fit the turbocharger to the exhaust manifold.
Tightening torque 30 Nm (22 lbf ft) |
3. |
Clean the sealing surfaces. Apply
30 20 971 Screw-thread paste
to the studs and fit the exhaust manifold to the cylinder head with a new gasket and new nuts.
Tightening torque 22 Nm (16 lbf ft) |
4. |
Connect the vacuum hose to the wastegate diaphragm unit.
|
5. |
Apply
30 20 971 Screw-thread paste
to the turbocharger studs. Change the gasket between the turbocharger and catalytic converter.
|
6. |
Connect the turbocharger's oil return pipe to the engine block.
Tightening torque 30 Nm (22 lbf ft) |
7. |
Attach the exhaust pipe to the turbocharger.
Tightening torque Nm ( lbf ft). |
8. |
Generously fill the turbocharger with oil through the oil delivery line connection. Rotate the turbine while filling.
|
9. |
Connect the oil delivery pipe with new sealing washers to the turbocharger and tighten the connection.
Tightening torque 20 Nm (15 lbf ft) |
10. |
Fit the exhaust manifold support.
|
11. |
Fit the cable duct.
|
13. |
Fit the lower bolt to the engine lifting eye.
|
14. |
Fit the wiring mounting to the camshaft cover and plug in the connectors to the glow plugs and mass air flow sensor.
|
15. |
Remove the plugs and fit the charge air pipe to the turbocharger and camshaft cover.
|
16. |
Fit the intake pipe to the turbocharger, mass air flow sensor and camshaft cover.
|
17. |
Fit the upper engine cover.
|
18. |
Connect the negative battery cable and fit the battery cover.
|
19. |
Since the battery has been disconnected, carry out the following procedures.
|
20. |
Check the oil level. Top up if necessary.
|
21. |
Connect an exhaust extraction hose, start the engine and check for leaks.
|