SAAB WIS ONLINE

Checking valve timing Z19DT

Checking valve timing Z19DT

To remove


1. Protect the wings with covers.

2. Remove the battery cover and the negative battery cable.

3. Raise the car.

4. Remove the front right wheel.

5. Remove the right wing liner.


6. Remove the lower engine cover.


7. Fit 83 96 145 Centring fixture, subframe - engine on to the engine subframe and 83 96 368 Supplementary kit to centring fixture with 32 025 007 Mounting fixture . Use only the front mounting fixture applied against the A/C compressor bracket. Take the strain off the engine bracket by adjusting the fixture.


8. Relieve the belt tensioner and lock it with 87 92 335 Lock pin . Remove the drive belt for the auxiliaries.


9. Remove the crankshaft pulley.

Important

The centre bolt of the belt pulley is not to be slackened.


10. Remove the idler pulley centre bolt on the lower timing cover. Use, for example, 2 screwdrivers to carefully prise off from two directions.

11. Lower the car.

12. Remove the upper engine cover.


13. Remove the A/C pressure connector and the air filter housing cover with filter.

14. Remove the air cleaner casing.

15. Remove the right-hand engine mounting.


16. Remove the upper and lower timing covers.

Note

Take note of the bolt locations.


17. Zero the engine by removing the bolt on the oil pump and fitting 32 025 009 Fixing tool, crankshaft .


18. Check that the camshaft marking is aligned with the mark on the camshaft cover.



To fit


1. Remove the tool and fit the bolt to the oil pump.

2. Fit the lower timing cover.


3. Fit the upper timing cover.

4. Fit the right-hand engine mounting.

Tightening torque on engine, 50 Nm (137 lbf ft)

Tightening torque to body 40 Nm + 60° (30 lbf ft + 60°).


5. Fit the air filter housing with cover and the connector on the intake hose.


6. Fit the upper engine cover.

7. Raise the car.

8. Fit the idler pulley centre bolt on the lower timing cover.

Tightening torque 25 Nm (18 lbf ft).

9. Fit the crankshaft pulley.

Note

Make sure the guide pin is in its recess.


Tightening torque 25 Nm (18 lbf ft).


10. Relieve the belt tensioner and fit the drive belt for the auxiliaries.


11. Remove the engine centring and fixing tools from the subframe.

12. Fit the lower engine cover.


13. Refit the right wing liner.


14. Fit the front right wheel. See Wheels .

15. Lower the car.

16. Connect the negative battery cable and fit the battery cover.

17. Carry out Procedures after reconnecting the battery .

18. Start the engine and turn it off.

19. Remove the wing cover.