Checking and adjusting basic charging pressure
| Checking and adjusting basic charging pressure | 
| Checks | 
| 1. | Remove the battery cover, the radiator pipe and engine cover.   | |
| 2. | Attach the battery cables and fit the battery. | |
| 3. | Undo the main fuse box in front of the battery tray and move it aside.   | |
| 4. | Detach the fuse holder from the battery tray. | |
| 5. | Remove the cable duct from the battery tray. | |
| 6. | Unplug the bonnet switch connector, undo the cable clip and remove the battery tray. | |
| 7. | Remove the turbocharger's upper heat shield.   | |
| 8. | Detach the hose from the diaphragm box.   | |
| 9. | Remove the control arm circlip with
        
         83 94 538 Circlip tool
        
        . 
 | |||||||
| 10. | Grip the pushrod with
        
         83 94 066 Pliers
        
        or similar and undo the lock nut. | |
| 11. | Detach the pushrod from the control arm. | |
| 12. | Move the control arm on the wastegate to the "Closed" position and adjust the end piece so that the pushrod can easily be fitted on the control arm pin. | |
| 13. | Detach the pushrod from the control arm pin. Turn the end piece clockwise about 2 turns to attain a tension of 2 mm. Hook the pushrod to the control arm pin.   | |
| 14. | Connect
        
         30 14 883 Pressure/vacuum pump
        
        to the diaphragm box and
        
         83 93 514 Charge pressure meter
        
        .   | |
| 15. | Carefully pump up an overpressure and read off the pressure on the pressure gauge just as the control rod starts to move (approx. 1 mm). The pressure should be 26.5 - 28.5 kPa. | |
| 16. | If the pressure is too low, shorten the rod until the correct pressure is obtained. | |
| 17. | Undo the control rod and apply a thin layer of
        
         90 513 210 Universal paste
        
        or similar to the control arm pin. | |
| 18. | Fit the control rod with a new clip. Use bottle-nose pliers.   | |
| 19. | Remove the pressure gauge and pump. | |
| 20. | Refit the hose to the diaphragm box. | |
| 21. | Fit the turbocharger's upper heat shield.   | |
| 22. | Plug in the bonnet switch connector, fit the cable clip and install the battery tray.   | |
| 23. | Fit the cable duct on the battery tray. | |
| 24. | Fit the fuse holder on the battery tray. | |
| 25. | Install the main fuse box in front of the battery tray. | |
| 26. | Fit the battery and attach the cables. | |
| 27. | Fit the engine cover, radiator pipe and battery cover.   | |
| 28. | Restore the car, see
        
         Procedures after reconnecting the battery
        
        . | |
| 29. | Carry out charge air adaptation: 
 | |||||||
| 29.a. | Warm up the engine. | 
| 29.b. | Accelerate full throttle at 2000 rpm a few times. The time the engine speed is in the range 2000-4000 rpm must exceed 2 seconds. | 

 
		