Centring tool, engine and subframe
| Centring tool, engine and subframe | 
| Fitting, removal/fitting tool, subframe | 
| 1. | Fit the tool on the trolley lift as illustrated. Pay attention to the positioning of the column and the locating pins.   | |
| 2. | Position the tool under the car's subframe as illustrated.   | |
| Fitting centring tool, subframe - engine | 
| 1. | Petrol B207 and B284:
        
        Install
        
         83 96 152 Kit, centring tool engine
        
        on
        
         83 96 145 Centring tool, subframe - engine
        
        with
        
         83 96 368 Supplement kit for centring fixture
        
        . Pay attention to bolt location. The distance from the washer to the slot in the threads is different on the two short sleeves. Fit only sleeve
        
         A
        
        as illustrated. Use
        
         Thread locking adhesive, Loctite 270
        
        on the sleeve. B284: Use 32 025 059 Support .   Petrol 1.8 XE: Use 83 96 145 Centring tool, subframe - engine with support from 83 96 368 Supplement kit for centring fixture .   Diesel: Fit 32 025 007 Installation fixture on 83 96 145 Centring tool, subframe - engine with support from 83 96 368 Supplement kit for centring fixture .   CV: In order to fit 83 96 145 Centring tool, subframe - engine to the subframe, a recess must be made in one of the fixture "legs" as illustrated below.   | |
| Adjusting (after subframe is fitted to body) | 
| 2. | Tighten the bolts to the prescribed torque. | |

 
         
		