SAAB WIS ONLINE

Control Valve Body Assembly Assemble

Control Valve Body Assembly Assemble

Lower and Upper Body Assemble


Lower and Upper Body Assemble

Callout Component Name
1 Control Valve Lower Body Spacer Plate Assembly
Warning

Do not use the old spacer plate. Install a NEW spacer plate. Reusing an old spacer plate may cause internal transmission leaks and transmission damage.


Note

Inspect the upper channel plate bolt pass through holes for damage or brinelling. Any damage around the PCS switch feed holes could cause leakage around the PCS switch seals. Replace as necessary.


2 Control Valve Upper Body Assembly
3 Control Valve Body Ball Check Valve (Qty: 9)
Warning

Do not use any type of grease or other material to hold the check ball valves in place during assembly. Grease will cause the valves to not operate properly, resulting in damage to the transmission.


4 Control Valve Channel Plate Assembly
5 Control Valve Body Bolt 6 x 55 (Qty: 1) Refer to Fastener Caution .

Tighten

12 Nm (9 lb ft)


Channel Plate and Upper Channel Plate Assemble


Channel Plate and Upper Channel Plate Assemble

Callout Component Name
1 Control Valve Channel Upper Plate Assembly
Note

Inspect the upper channel plate bolt pass through holes for damage or brinelling. Any damage near the PCS feed holes could cause leakage around the PCS switch seal. Replace as necessary.


2 Control Valve Body Bolt M6 x 35 (Qty: 3) Refer to Fastener Caution .

Procedure

Hand tighten for alignment, then tighten in sequence, after all bolts are installed.

Tighten

12 Nm (9 lb ft)
3 Control Valve Body Bolt M6 x 65 (Qty: 5)

Procedure

Tighten in sequence.

Tighten

12 Nm (9 lb ft)
4 Control Valve Body Bolt M6 x 55 (Qty: 2)

Procedure

Tighten in sequence.

Tighten

12 Nm (9 lb ft)