Refrigerant - draining and filling
 
  
 
 
  
   
    
     | 
      | 
     
      Refrigerant - draining and filling
      | 
    
   
  
  
  
   The equipment for draining and filling refrigerant should be flexible and easy-to-handle. A scale keeps tabs on how much refrigerant is drained and filled. A requirement for the equipment is that it must be sufficiently quick.
   
   
  
  
   It is important to bear in mind the following when choosing equipment:
   
   
  
  
  
   
    
     
      | 
       •
       | 
      
       Powerful vacuum pump and vacuum gauge for effective vacuum extraction and thereby drying of the system.
        
        
       | 
     
    
   
  
  
   
    
     
      | 
       •
       | 
      
       Good purification from contaminants. The filter should be ample in size and generate a warning when it is full.
        
        
       | 
     
    
   
  
  
   
    
     
      | 
       •
       | 
      
       Simple handling. Automatic operation makes work more efficient.
        
        
       | 
     
    
   
  
  
   
    
     
      | 
       •
       | 
      
       Note that the difference in price is often based on whether the equipment is fully automated or semi-automated. A semi-automated machine requires monitoring.
        
        
       | 
     
    
   
  
  
   
    
     
      | 
       •
       | 
      
       Note that there are local equipment requirements.
        
        
       | 
     
    
   
  
  
  
   Compare with the following equipment:
   
   
  
  
  
   
  
  
   
    
     
      | 
       •
       | 
      
       Robinair
        
        
       
        Internet address: www.robinair.com
        
       | 
     
    
   
  
  
   
    
     
      | 
       •
       | 
      
       WAECO RHS 1100
        
        
       
        Internet address: www.waeco.com
        
       |