Testing for open/short circuits
| Testing for open/short circuits | 
The ohmmeter must not be used to test components containing semi-conductors, e.g. control modules and relay with timing functions, etc.
When measuring resistance, the power supply to the system being tested must be disconnected as the measuring instrument generates a weak current in the circuit in question.
This is done to ensure that there is no current already in the tested circuit and that the correct reading is obtained.
| Testing for open circuits by measuring voltage. | 
 
   
    
   
   | 1. | Turn on the load. | |
| 2. | Set the multimeter for measuring voltage and connect the negative lead of the voltmeter to a good grounding point. | |
| 3. | Connect the positive lead of the voltmeter to the point where the voltage is to be read. | |
| 4. | On the output side of switches/control modules, it is better to start checking from these and gradually work your way towards the load. When there is no longer a voltage reading, you will have gone past the break point. | |
| 5. | On the input side of switches/control modules/consumers, it is better to start at the power source (normally a fuse) and then move gradually towards the switch/control module/consumer. When there is no longer a voltage reading, you will have gone past the break point. | |
| Testing for open circuits by measuring resistance | 
 
   
    
   
   | 1. | Make sure the component or lead to be tested is not under tension (e.g. by removing the relevant fuse). | |
| 2. | Set the multimeter for measuring ohms and connect the ohmmeter to each end of the component/lead to be tested. | |
| 3. | Jiggle the relevant wiring harness while observing the ohmmeter. Normally, the resistance of a wiring harness is less than 1 ohm. Specified values apply to components. | |
| Testing for short circuits to ground | 
 
   
    
   
   | 1. | Make sure the lead being tested is not under tension (e.g. remove the relevant fuse) and that any loads are disconnected. | |
| 2. | Set the multimeter for measuring ohms. | |
| 3. | Connect one test lead to a good ground and the other to the point to be tested. | |
| 4. | Carefully jiggle the wiring harness and make sure the multimeter reading shows infinite resistance (OL) all the time. | |

 
     
		