Water Pump and Balance Shaft Chain and Tensioner Installation
Water Pump and Balance Shaft Chain and Tensioner Installation |
1. |
Refer to
Fastener Caution
.
Install the upper balance shaft chain guide (1) and bolts and tighten to 12 Nm (106 lb in) . |
2. |
Install the small balance shaft chain guide (1).
|
3. |
Install the balance shaft chain guide (1) and bolts and tighten to
12 Nm (106 lb in)
.
|
4. |
Install the adjustable balance shaft drive chain guide (1).
|
5. |
Install the adjustable balance shaft drive chain guide bolts and tighten to
10 Nm (89 lb in)
.
|
6. |
Reset the timing chain tensioner (1) by performing the following steps:
|
6.1. |
Turn the tensioner plunger 90 degrees in its bore and compress the plunger.
|
6.2. |
Turn the tensioner back to the original 12 o'clock position and insert a paper clip (2) through the hole in the plunger body and into the hole in the tensioner plunger.
|
7. |
Install the timing chain tensioner.
|
8. |
Install the chain tensioner bolts and tighten to
10 Nm (89 lb in)
.
|
9. |
Remove the paper clip from the balance shaft drive chain tensioner.
|