Secondary Pivot Arm Timing Chain Guide Installation - Right Side
Secondary Pivot Arm Timing Chain Guide Installation - Right Side |
1. |
Ensure that the secondary pivot arm timing chain guide bank 1 (1) is being installed.
|
2. |
Install the secondary pivot arm timing chain guide (1).
|
3. |
Refer to
Fastener Caution
.
Install the secondary pivot arm timing chain guide bolt (2) and tighten to 23 Nm (17 lb ft) . |