Upper Intake Manifold Installation
 
  
 
 
  
   
    
     |  | Upper Intake Manifold Installation | 
   
  
  
   
   
    
    
    
    
    
   
   
    
   
   
   
    
     
      
       | 1. | Install the 2 upper-to-lower intake manifold alignment pins (1). 
 
   
 | 
     
    
   
   
    
     
      
       | 2. | Install the NEW upper intake manifold gasket bank 1 (2). 
 
   
 | 
     
    
   
   
    
     
      
       | 3. | Install the NEW upper intake manifold gasket bank 2 (1). 
 
 | 
     
    
   
   
    
     
      
       | 4. | Install the upper intake manifold (3). 
 
   
 | 
     
    
   
   
    
     
      
       | 5. | Refer to
        
         Fastener Caution
        
        . 
 Install the intake manifold's two short bolts (2) and tighten to
        
         23 Nm (17 lb ft)
        
        .
 
 
 | 
     
    
   
   
    
     
      
       | 6. | Install the intake manifold's four long bolts (1) and tighten to
        
         23 Nm (17 lb ft)
        
        . 
 
 | 
     
    
   
   
    
     
      
       | 7. | Install the power brake booster vacuum pipe connector (4) to the power brake booster vacuum pipe venturi. 
 
 | 
     
    
   
   
    
     
      
       | 8. | Install the fuel injector wiring harness plug to fuel injector wiring harness bracket. 
 
   
 |