Sunroof Motor/Actuator Initialization/Teach Process (Existing Motor)
 
  
 
 
  
   
    
     |  | Sunroof Motor/Actuator Initialization/Teach Process (Existing Motor) | 
   
  
  
   
   
    
    
    
    
    
   
   
    
   
   
    Perform the Initialization/Teach Process any time a new sunroof motor actuator is installed in the vehicle.
    
    
   
   
    "Manual" indicates the first switch detent
    
    
   
   
    "Express" indicates the second switch detent
    
    
   
   
   
    
     
      
       | 1. | Ensure that the electrical harness on the headliner is connected to the sunroof motor. 
 
 | 
     
    
   
   
    
     
      
       | 2. | Put the ignition in the RUN position. (CAL file will be automatically downloaded by Body Control housing, BCM). 
 
 
         "Manual close" is allowed and limited "manual open" is allowed
         | 
     
    
   
   
    
     
      
       | 3. | Re-initialization (Normalization) - Press "manual close switch" until glass/roller blind finds hard stop. After initialization "express open" is allowed but not "express close" 
 
 | 
     
    
   
   
    
   
   
    
     
      
       |  | 4.1. | Open the sunroof window/sunshade with the express or manual open the switch to the full open position the release the switch. 
 
 | 
     
    
   
   
    
     
      
       |  | 4.2. | Press "manual open switch" for more than 10 seconds or until the sunroof window starts AND reaches the closed position. 
 
 | 
     
    
   
   
    
     
      
       | 5. | Verify the operation of the sunroof. 
 
 | 
     
    
   
   
   
    
     
      
       | Note | 
      
       | 
         The Initialization/Teach Process is not complete if any of the following actions take place before the initialization cycle is done:
         | 
      
       | • | The sunroof switch is not held in the close position. 
 
 | 
      
       | • | The ignition and/or battery power has been removed. 
 
 | 
      
       | • | The glass panel has not reached the closed position. 
 
 | 
      
       | 
         The Initialization/Teach Process must be restarted if the procedure is not carried out completely.
         |