Secondary Camshaft Intermediate Drive Chain Installation - Right Side
|
Secondary Camshaft Intermediate Drive Chain Installation - Right Side
|
1.
|
Ensure that the crankshaft is in the stage 2 timing drive assembly position (1).
|
2.
|
Install the secondary timing chain (1).
|
3.
|
Place the secondary timing chain bank 1 around the timing chain idler sprocket bank 1, aligning the secondary timing chain link (1) with the alignment access hole (2) made in the timing chain idler sprocket bank 1.
|
4.
|
Wrap the secondary timing chain bank 1 around both camshaft position actuator bank 1.
|
5.
|
Ensure there are 10 links (1) between the secondary timing chain links for the camshaft position actuator bank 1.
|
6.
|
Align the exhaust camshaft position actuator bank 1 alignment triangle mark (1) with the secondary timing chain bank 1 link (2).
|
7.
|
Align the intake camshaft position actuator bank 1 alignment triangle mark (2) with the secondary timing chain bank 1 link (1).
|
8.
|
There will be 22 links (1) between the timing chain idler sprocket bank 1 and each camshaft position actuators bank 1.
|