Turbocharger Wastegate Actuator Adjustment
 
  
 
 
  
   
    
     |  | Turbocharger Wastegate Actuator Adjustment | 
   
  
  
   
   
    
    
    
    
    
   
   
    
   
   
   
    
   
   
    
     
      
       | 2. | Allow the engine to cool. 
 
 | 
     
    
   
   
    
     
      
       | 3. | Loosen the lock nut (2). 
 
   
 | 
     
    
   
   
    
     
      
       | 4. | Hand tighten the lock nut (1) until it is seated on the wastegate arm and slight spring tension is observed. 
 
 | 
     
    
   
   
    
     
      
       | 5. | 
          
           
            | Note |  
            | • | Ensure the wastegate actuator rod does not rotate during the tightening procedure. If the rod does rotate, it will be necessary to start the procedure again. 
 
 |  
            | • | After the lock nut (1) has been tightened three complete turns, it should not move for the remainder of the procedure. 
 
 |  Mark the lock nut (1) with a paint pen to mark a starting position and tighten three complete turns.
 
 
 | 
     
    
   
   
    
     
      
       | 6. | Refer to
        
         Fastener Caution
        
        . 
 While holding the wastegate rod tighten the nut (2) hand tight.
 
 
 | 
     
    
   
   
    
     
      
       | 7. | Tighten the nut (2) while holding nut (1) in place to
        
         10 Nm (89 lb in)
        
        . Apply threadlock (P/N 12345493) to the wastegate actuator rod threads on both sides. 
 
 |