Shock Absorber Replacement (GNC)
|
Shock Absorber Replacement (GNC)
|
Callout
|
Component Name
|
Preliminary Procedure
|
1
|
Upper Fastener (Qty: 2)
Refer to
Fastener Caution
.
Procedure
2.
|
Apply locking agent on the bolts.
|
Tighten
100 Nm (74 lb ft)
|
2
|
Lower Fastener
Procedure
2.
|
Tightening to torque takes place when vehicle is standing on the ground.
|
Tighten
150 Nm (110 lb ft) + 60 to 75 degrees
|
3
|
Shock Absorber Bracket Nut
Tighten
20 Nm (15 lb ft)
|
4
|
Shock Absorber Bracket
Procedure
Transfer the bracket to the new shock absorber.
|
5
|
Shock Absorber
Procedure
Disconnect any electrical connectors, if equipped.
|