SAAB WIS ONLINE

Power supply +X

Power supply +X


Description of operation/List of components

Positive voltage is fed to ignition switch 20 via Maxi fuse 3 and crimp J1.

When the ignition switch is turned to any other position than OFF, the 30 and X connections in the ignition switch will be connected together.

+X voltage is fed via crimp J163 to:


Fuse board 22a

- fuses 9 and 11

Light switch 10


When the light switch is set to position 2, current will be supplied to:


Fuse board 22a

- fuses 29, 30 and 37