Test pressurization of the charge air cooler and pressure pipes, 4-cyl.
/
9-5
/
2000
/
2. Engine
/
Turbocharger system
/
Adjustment/replacement
/
Test pressurization of the charge air cooler and pressure pipes, 4-cyl.
Related Articles
Checking the wastegate valve, 4-cyl.
Checking the charge air bypass valve, 4-cyl.
Turbo bypass valve, V6
Checking the charge air bypass valve, V6
Checklist for changing turbocharger and engine control module
Leak check, fuel pressure, flow capacity and adaptation procedures