Receiver, high-pressure pipe, B207
Receiver, high-pressure pipe, B207 |
Important | ||
The A/C receiver and the compressor oil absorb moisture from the air, which can then not be removed. Plug all connections that are opened immediately. |
||
To remove |
1. |
Drain the refrigerant from the A/C system, see
Draining and filling the refrigerant
.
|
2. |
Dismantle the upper engine cover.
|
3. |
Dismantle PAD connection on the front right structural member. Plug the openings.
|
4. |
Dismantle the high pressure pipe's PAD connection from the receiver. Plug the openings.
|
5. |
Lift out the receiver's high pressure pipe.
|
To fit |
1. |
Adjust the oil quantity in the A/C system. See
Filling and adjusting the compressor oil
.
|
2. |
Insert the receiver's high pressure pipe into position.
|
3. |
Replace the sealing washer and fit the receiver high pressure pipe to the receiver.
Tightening torque 18 Nm (13 lbf ft) |
4. |
Replace the sealing washer and fit the receiver high pressure pipe to the PAD connection on the front right structural member.
Tightening torque 15 Nm (11 lbf ft) |
5. |
Fit the upper engine cover.
|
6. |
Vacuum pump and fill the A/C system with refrigerant. See
Draining and filling the refrigerant
.
|
7. |
Test the A/C system. See
A/C system performance test
|