Flushing
| Flushing |
Special Tools
| • |
GE-8800
ACR 2000 Air Conditioning Service Center
|
|
| • |
GE-45268
Flush Adapter Kit
|
|
| • |
GE-41447
Leak Detection Dye
|
|
| • |
GE-42220
Universal 12V Leak Detection Lamp
|
|
For equivalent regional tools. Refer to Special Tools
| Note | ||
|
Flushing with the GE-8800 ACR 2000 Air Conditioning Service Center is not intended to remove metal from the A/C system. |
Flushing is intended to remove the following:
| • |
Contaminated polyalkylene glycol (PAG) oil
|
|
| • |
Desiccant, following a desiccant bag failure
|
|
| • |
Overcharge of PAG oil
|
|
| • |
Refrigerant contamination
|
|
| 1. |
Recover the refrigerant. Refer to Refrigerant Recovery and Recharging (Belt Driven Compressor) |
|||||||
| 2. |
Remove the thermal expansion valve (TXV). Refer to
Air Conditioning Evaporator Thermal Expansion Valve Replacement
|
|
| 3. |
Install the stud for the
GE 45268
Flush Adapter Kit kit onto the GE 45268-121.
|
|
| 4. |
Install the GE 45268-121 in place of the TXV.
|
|
| 5. |
Refer to
Fastener Caution
Install the TXV mounting bolts. TightenTighten the bolts to 7 Nm (62 lb in). |
|
| 6. |
Connect the evaporator line to the GE 45268-121.
|
|
| 7. |
Install the TXV block fitting nut.
TightenTighten the bolts to 17 Nm (12.5 lb ft). |
|
| 8. |
Remove the A/C compressor. Refer to
A/C compressor, replacement (LF1)
A/C compressor, replacement (LAU)
|
|
| 9. |
Install GE 45268-10 to the A/C compressor hose assembly.
|
|
| 10. |
Install the nut and bolt from the
GE 45268
Flush Adapter Kit kit to the GE 45268-10 and compressor hose assembly.
TightenTighten the bolts to 17 Nm (12.5 lb ft). |
|
| 11. |
Forward flow refrigerant flushing is recommended for contaminated refrigerant or PAG oil.
Perform the following procedure: |
|
| 11.1. |
Service the filter with ACDelco P/N GF 470, before each flush.
|
|||||||
| 11.2. |
Install the port plugs GE 45268-9 onto the GE 45268-10.
|
| 11.3. |
Install the fitting GE 45268-7 onto the GE 45268-10.
|
| 11.4. |
Install the fitting GE 45268-8 onto the GE 45268-10.
|
| 11.5. |
Connect GE 45268-1 flush filter to the suction port of GE 45268-7 flush adapter.
|
| 11.6. |
Connect the blue hose from the
GE 8800
ACR 2000 Air Conditioning Service Center to the GE 45268-1 flush filter adapter.
|
| 11.7. |
Connect the red hose from the
GE 8800
ACR 2000 Air Conditioning Service Center to the GE 45268-8 flush adapter.
|
| 12. |
Reverse flow refrigerant flush is recommended for desiccant bag failure. Replace the A/C condenser when the A/C flush is complete and perform the following procedure:
|
|
| 12.1. |
Service the filter with ACDelco P/N GF 470, before each flush. |
|||||||
| 12.2. |
Install the port plugs GE 45268-9 onto the J 45268-10.
|
| 12.3. |
Install the fitting GE 45268-7 onto the J 45268-10.
|
| 12.4. |
Install the fitting GE 45268-8 onto the J 45268-10.
|
| 12.5. |
Connect GE 45268-1 flush filter to the discharge port of GE 45268-7 flush adapter.
|
| 12.6. |
Connect the blue hose from the
GE 8800
ACR 2000 Air Conditioning Service Center to the GE 45268-1 flush filter adapter.
|
| 12.7. |
Connect the red hose from the
GE 8800
ACR 2000 Air Conditioning Service Center to the GE 45268-8 flush adapter.
|
| 13. |
Flush the A/C system. Follow the instructions for the GE 8800 ACR 2000 A/C service center. |
|||||||
| 14. |
Disconnect the red hose on the
GE 8800
ACR 2000 Air Conditioning Service Center from the GE 45268-10.
|
|
| 15. |
Disconnect the blue hose on the
GE 8800
ACR 2000 Air Conditioning Service Center from the GE 45268-1.
|
|
| 16. |
Remove GE 45268-1 from the GE 45268-10.
|
|
| 17. |
Remove the GE 45268-10 from the A/C compressor hose assembly.
|
|
| 18. |
If you will reinstall the removed A/C compressor, perform the following procedure: |
||||||||||
| 18.1. |
Remove the A/C compressor drain plug.
|
| 18.2. |
Drain the PAG oil from the A/C compressor. Rotate the compressor input shaft to assist in draining the PAG oil from the compressor.
|
| 18.3. |
Install the A/C compressor drain plug.
TightenTighten the drain plug to 16 Nm (12 lb ft). |
| 18.4. |
Add the total system capacity of PAG oil to the A/C compressor. Refer to
Refrigerant System Specifications
|
| 19. |
If you will replace the A/C compressor after flushing the system, perform the following procedure:
|
|
| 19.1. |
Determine if the new service compressor is shipped with PAG oil. Refer to
Refrigerant System Specifications
|
| 19.2. |
If the service compressor is shipped with PAG oil, DO NOT drain the new PAG oil from the compressor.
|
| 19.3. |
Deduct the amount of PAG oil shipped with the service compressor from the amount of PAG oil listed in the capacities table. Refer to
Refrigerant System Specifications
|
| 19.4. |
Add the calculated amount to the compressor, as needed.
|
| 20. |
Add one bottle of GE 41447 Leak Detection Dye directly to the A/C Compressor. |
|||||||
| 21. |
Fit the A/C compressor. Refer to
A/C compressor, replacement (LF1)
A/C compressor, replacement (LAU)
|
|
| 22. |
Remove GE 45268-121.
|
|
| 23. |
Inspect the TXV for debris. Clean or replace as needed.
|
|
| 24. |
Install the TXV. Refer to
Air Conditioning Evaporator Thermal Expansion Valve Replacement
|
|
| 25. |
Evacuate and recharge the A/C system. Refer to
Refrigerant Recovery and Recharging (Belt Driven Compressor)
|
|
| 26. |
Leak test the fittings using
GE 42220
Universal 12V Leak Detection Lamp
|
|