Instrument Panel Tie Bar Replacement
|
Instrument Panel Tie Bar Replacement
|
Callout
|
Component Name
|
Preliminary Procedure
|
1
|
Instrument Panel Tie Bar Assembly Fastener (Qty: 10)
Refer to
Fastener Caution
.
Tighten
22 Nm (16 lb ft)
|
2
|
Heater and Air Conditioning Evaporator and Blower Module Fastener (Qty: 3)
Procedures
Release the heater and air conditioning evaporator and blower module from the I/P tie bar and secure the module at the body.
Tighten
5 Nm (44 lb in)
|
3
|
Instrument Panel Tie Bar Assembly
Procedures
1.
|
Remove the hood release handle.
|
2.
|
Note location and routing of the I/P wiring harness prior to removal of the I/P tie bar assembly to ensure proper reinstallation.
|
3.
|
Disconnect the wiring harness from the I/P tie bar assembly.
|
4.
|
With the aid of an assistant, remove the I/P tie bar assembly from the vehicle.
|
5.
|
If replacing the I/P tie bar assembly, transfer all necessary components.
|
|