SAAB WIS ONLINE

Cylinder Head Cleaning and Inspection

Cylinder Head Cleaning and Inspection



Special Tools

GE 8001 Dial Indicator Set

GE 8358 Carbon Removal Brush

EN 28410 Gasket removal tool

EN 42096 Valve Guide Reamer

EN-47909 Injector Bore and Sleeve Cleaning Kit


For equivalent regional tools, refer to Special Tools .

Cleaning Procedure


1. Remove any old thread sealant, gasket material or sealant using EN 28410 remover.

2. Clean all cylinder head surfaces with non-corrosive solvent.

3. Refer to Safety Glasses Warning .

Blow out all the oil galleries using compressed air.

4. Remove any carbon deposits from the combustion chambers using the GE 8358 brush.

5. Clean any debris or build-up from the lifter pockets.


Visual Inspection


1. Inspect the cylinder head camshaft bearing surfaces for the following conditions:


Excessive scoring or pitting

Discoloration from overheating

Deformation from excessive wear

If the camshaft bearing journals appear to be scored or damaged, you must replace the cylinder head. DO NOT machine the camshaft bearing journals.

2. If any of the above conditions exist on the camshaft bearing surfaces, replace the cylinder head.

3. Inspect the cylinder head for the following:

Cracks, damage or pitting in the combustion chambers

Debris in the oil galleries - Continue to clean the galleries until all debris is removed.

Coolant leaks or damage to the deck face sealing surface - If coolant leaks are present, measure the surface warpage as described under Cylinder Head Measurement - Deck Flatness Inspection.

Burrs or any defects that would degrade the sealing of the NEW secondary camshaft drive chain tensioner gasket

Damage to any gasket surfaces

Damage to any threaded bolt holes

Burnt or eroded areas in the combustion chamber

Cracks in the exhaust ports and combustion chambers

External cracks in the water passages

Restrictions in the intake or exhaust passages

Restrictions in the cooling system passages

Rusted, damaged or leaking core plugs

4. If the cylinder head is cracked or damaged, it must be replaced. No welding or patching of the cylinder head is recommended.

5. Inspect the camshaft position actuator oil feed check valves. Damaged, restricted or clogged check valves must be replaced. Refer to Cylinder Head Disassemble (LAU or LBW) .


6. Inspect the fuel rail injector bores and clean with the EN-47909 kit, if required.



Cylinder Head Measurement


Camshaft Journal Clearance

1. Install the camshaft bearing cap in the cylinder head without the camshaft.

2. Refer to Fastener Caution .

Install the camshaft bearing cap bolts and tighten to 10 Nm (89 lb in) .

3. Measure the camshaft bearings using an inside micrometer.

4. Subtract the camshaft journal diameter from the camshaft bearing diameter. This will provide the running clearance. If the running clearance exceeds specifications and the camshaft journals are within specification, replace the cylinder head.




Camshaft Journal Alignment

1. Ensure the camshafts are serviceable.

2. Inspect the cylinder head camshaft bearing surfaces for any imperfections or scratches that could inhibit proper camshaft clearances. Repair minor imperfections or scratches.

3. Install the camshafts in the cylinder head.

4. Install the camshaft bearing caps.

5. Install the camshaft bearing cap bolts and tighten to 10 Nm (89 lb in) .

6. Ensure the camshafts spin freely in the cylinder head. If the camshaft does not run freely, replace the cylinder head.




Deck Flatness Inspection

1. Ensure the cylinder head decks are clean and free of gasket material.


2. Inspect the surface for any imperfections or scratches that could inhibit proper cylinder head gasket sealing.

3. Place a straight-edge diagonally across the cylinder head deck face surface.

4. Measure the clearance between the straight-edge and the cylinder head deck face using a feeler gauge at 4 points along the straight-edge.

5. If the warpage is less than 0.05 mm (0.002 in), the cylinder head deck surface does not require resurfacing.

6. If the warpage is between 0.05-0.20 mm (0.002-0.008 in) or any imperfections or scratches that could inhibit proper cylinder head gasket sealing are present, the cylinder head deck surface requires resurfacing.

7. If resurfacing is required the maximum amount that can be removed is 0.25 mm (0.010 in).

8. If the cylinder head deck surface requires more than 0.25 mm (0.010 in) material removal the head must be replaced.




Valve Guide Measurement

1. Measure the valve stem (1)-to-guide (2) clearance. Excessive valve stem-to-guide clearance may cause an excessive oil consumption and may also cause a valve to break. Insufficient clearance will result in noisy and sticky functioning of the valve and will disturb the engine assembly smoothness.


2. Clamp the GE 8001 set to the cylinder head at the camshaft cover rail.

3. Locate the dial indicator so that the movement of the valve stem from side to side, crossways to the cylinder head, will cause a direct movement of the indicator stem. The dial indicator stem must contact the side of the valve stem just above the valve guide.

4. Drop the valve head about 0.064 mm (0.0025 in) off the valve seat.

5. Use light pressure when moving the valve stem from side to side in order to obtain a clearance reading. Refer to Engine Mechanical Specifications (LAU or LBW) for proper clearance.

If valve lash is greater than the specifications and a new standard diameter valve stem will not bring lash within specifications, the valve guide may be oversized by 0.075 mm (0.003 in) using the EN 42096 reamer. There is 1 size of oversized valve stem available for service.

Valve guide wear at the bottom 10 mm (0.390 in) of the valve guide is not significant to normal operation.

If oversizing the guide does not bring the clearance within specifications, replace the cylinder head.