SAAB WIS ONLINE

Secondary Timing Chain Tensioner Installation - Left Side

Secondary Timing Chain Tensioner Installation - Left Side



Special Tools

EN 46112 Tensioner Retraction Pins

EN 49416 Reset Tool


For equivalent regional tools, refer to Special Tools .



1. Ensure that the secondary timing chain tensioner bank 2 (2) is being installed.


2. Using the EN-49416 reset tool, reset the secondary timing chain tensioner plunger.


3. Install the plunger into the secondary timing chain tensioner body.


4. Compress the plunger into the body and lock the secondary timing chain tensioner by inserting the EN 46112 pin into the access hole in the side of the secondary timing chain tensioner body.


5. Slowly release pressure on the secondary timing chain tensioner. The secondary timing chain tensioner should remain compressed.

6. Verify the proper placement of the secondary timing chain tensioner gasket tab (1).


7. Refer to Fastener Caution .

Tighten the 2 secondary timing chain tensioner bolts a first pass to 5 Nm (44 lb in) .

8. Tighten the 2 secondary timing chain tensioner bolts a second pass to 23 Nm (17 lb ft) .

9. Release the secondary timing chain tensioner by pulling out the EN 46112 pin and unlocking the tensioner plunger.


10. Verify the left secondary camshaft drive chain timing mark alignments (1-6). Refer to Timing Chain Alignment Diagram .