Category:
Adjustment/replacement
/
9-5
/
2004
/
2. Engine
/
Turbocharger system
/
Adjustment/replacement
/
Test pressurization of the charge air cooler and pressure pipes, 4-cyl.
Turbo, 4-cyl.
Checking and adjusting basic charging pressure
Checking the wastegate valve, 4-cyl.
Checking the charge air bypass valve, 4-cyl.
Checklist for changing turbocharger and engine control module
Leak check, fuel pressure, flow capacity and adaptation procedures